User Tools

Site Tools


academy:student:scheduling_secondary_combo_step3

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
academy:student:scheduling_secondary_combo_step3 [2018/12/17 15:59] – created jstanfordacademy:student:scheduling_secondary_combo_step3 [2021/04/07 19:49] (current) apape
Line 1: Line 1:
 <div #no-print><div training__section_left>C</div></div> <div #no-print><div training__section_left>C</div></div>
 ----- -----
-======TxEIS Scheduling - Combination (Step 2)======+======ASCENDER Scheduling Guide - Combination (Step 3)======
  
-<WRAP box #no-print>{{:images:printer.png|printer icon}}[[:academy:student:scheduling_secondary_combo_step2?do=export_pdf&toclevels=1-3&book_title=TxEIS Scheduling - Secondary - Combination Step 2| Click here to generate a PDF of this guide (Combination - Step 2)]].+<WRAP box #no-print>{{:images:printer.png|printer icon}}[[:academy:student:scheduling_secondary_combo_print_all?do=export_pdf&toclevels=1-3&book_title=ASCENDER Scheduling - Secondary - Combination| Click here to generate a PDF of this guide (Combination Scheduling Steps 1, 2, and 3)]].
 </WRAP> </WRAP>
  
Line 17: Line 17:
 </WRAP> </WRAP>
  
-<WRAP round intro>Step covers running and accepting the Live student scheduling load.\\  \\   +<WRAP round intro>Step covers running and accepting the Live student scheduling load.\\  \\   
-**IMPORTANT:** Do not proceed unless [[academy:student:scheduling_secondary_combo_step1|Combination - Step 1]] is completed.</WRAP>+**IMPORTANT:** Do not proceed unless [[academy:student:scheduling_secondary_combo_step1|Combination - Step 1]] and [[academy:student:scheduling_secondary_combo_step2|Step 2]] are completed.</WRAP>
  
 Before you proceed, run and review all [[scheduling:reports:schedulingreports:preload|Scheduling pre-load reports]]. Before you proceed, run and review all [[scheduling:reports:schedulingreports:preload|Scheduling pre-load reports]].
Line 31: Line 31:
   - ++Accept the scheduling load.|{{page>academy:student:scheduling_secondary_combo_step2_accept_live_load&inline}}++   - ++Accept the scheduling load.|{{page>academy:student:scheduling_secondary_combo_step2_accept_live_load&inline}}++
   - ++Modify student schedules as needed.|{{page>academy:student:scheduling_secondary_combo_step2_modify_schedules&inline}}++   - ++Modify student schedules as needed.|{{page>academy:student:scheduling_secondary_combo_step2_modify_schedules&inline}}++
 +  - ++Commit course number changes if applicable.|{{page>academy:student:scheduling_secondary_combo_step2_commit_course_number_changes&inline}}++
  
 =====Run Reports===== =====Run Reports=====
Line 37: Line 37:
 Run and review all [[scheduling:reports:schedulingreports:postload|Scheduling post-load reports]]. Run and review all [[scheduling:reports:schedulingreports:postload|Scheduling post-load reports]].
  
 +\\  
 +
 +{{page>academy:student:scheduling_changes_after_first_day}}
  
academy/student/scheduling_secondary_combo_step3.1545062350.txt.gz · Last modified: 2018/12/17 10:59 (external edit)