User Tools

Site Tools


general:guide:scheduling_phasei_automated_intro

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
general:guide:scheduling_phasei_automated_intro [2018/07/10 18:32] jstanfordgeneral:guide:scheduling_phasei_automated_intro [2020/07/08 13:52] (current) – external edit 127.0.0.1
Line 1: Line 1:
-<WRAP round intro>Follow these steps if you are using a TxEIS program (Master Schedule Generator or MSALGO) to create the campus master schedule (section and meeting times) and to create student schedules.+<WRAP round intro>Follow these steps if you are using an ASCENDER program (Master Schedule Generator or MSALGO) to create the campus master schedule (section and meeting times) and to create student schedules.
 \\   \\  
 ++++Three Scheduling Options Flow Chart:|{{page>academy:student:scheduling_flow_chart_phases&inline}}++++ ++++Three Scheduling Options Flow Chart:|{{page>academy:student:scheduling_flow_chart_phases&inline}}++++
general/guide/scheduling_phasei_automated_intro.1531247557.txt.gz · Last modified: 2018/07/10 13:32 (external edit)