Automated Scheduling - (Master Schedule Generator) Quick Checklist |
District: |
Anticipated Scheduling Completion Date: |
Team Members: |
✔ | Step | Completion Date | Completed By | Notes |
Step 1 |
| Enter student course requests. | | | |
| Modify course requests as needed. | | | |
| Back up course requests. | | | |
| Run pre-load reports. | | | |
Step 2 (Create Master Schedule using MSG) |
| Clear Resource Allocator (RA) records from previous year. | | | |
• Update and Verify Resource Allocator Records: |
| Set meeting time parameters. | | | |
| Create RA records. | | | |
| (Optional) Add or update MSG tables. | | | |
| Update instructor assignments. | | | |
| Print/verify instructor information. | | | |
| Recalculate MSG section data if needed. | | | |
| Add and update section data. | | | |
| Print and verify room list. | | | |
| Verify all section data. | | | |
• Generate campus Master Schedule: |
| Set options. | | | |
| Generate campus master schedule. | | | |
| Verify master schedule data. | | | |
| Review, add, and update section and meeting time data. | | | |
| Verify instructor data. | | | |
| Print SCH2500 report to review next year schedule. | | | |
• Run trial scheduling load: |
| Set options. | | | |
| Run trial scheduling load. | | | |
| View all scheduling load reports. | | | |
| Continue running load and checking reports until satisfactory. | | | |
• Accept Master Schedule: |
| Accept the master schedule. | | | |
Step 3 |
| Back up data. | | | |
• Run live scheduling load: |
| Verify options. | | | |
| Run live scheduling load. | | | |
| View all scheduling load reports. | | | |
| Accept scheduling load. | | | |
| Review student course assignments. | | | |
| Modify schedules as needed. | | | |
• Run reports: |
| Run/review all post-load reports. | | | |