This tab allows you to run a trial scheduling load and generate a statistics report by grade level.

The trial scheduling load tests the courses created by the Master Schedule Generator and any courses that already exist in the campus master schedule. This allows you to determine how well students will be scheduled with courses created by Maintenance > Master Schedule Generator > Generate Campus Schedule.

The scheduling load options must be set on the Options tab before you run the scheduling load.