User Tools

Site Tools


general:budparameter:2000:include_levels

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
general:budparameter:2000:include_levels [2018/07/24 18:20] – external edit 127.0.0.1general:budparameter:2000:include_levels [2020/05/22 21:04] (current) emoreno
Line 1: Line 1:
-Type a Y or an N to include or exclude specific budget levels (Requested, Recommended, and Approved) separating each of the three budget levels with a comma and no space (e.g., N,N,Y). Or, click {{:images:picklist_large.png?60|Ellipsis Icon}} to [[general:search_select_budget_report_levels|select budget report levels]]. This field is required.+Type a Y or an N to include or exclude specific budget levels (Requested, Recommended, and Approved) separating each of the three budget levels with a comma and no space (e.g., N,N,Y). Or, click {{:general:report_ellipsis.jpg|Ellipsis Icon}} to [[general:search_select_budget_report_levels|select budget report levels]]. This field is required.
  
  
  
general/budparameter/2000/include_levels.1532456407.txt.gz · Last modified: 2018/07/24 13:20 (external edit)