User Tools

Site Tools


Sidebar

Table of Contents

scheduling:maintenance:masterschedulegenerator:trialschedulingload:schedulestudents

This is an old revision of the document!


Schedule Load (Trial Scheduling Load)

Scheduling > Maintenance > Master Schedule Generator > Trial Scheduling Load > Schedule Load

This tab allows you to run a trial scheduling load and generate a statistics report by grade level. The trial scheduling load tests the courses created by the Master Schedule Generator and any courses that already exist in the campus master schedule. This allows you to determine how well students will be scheduled with courses created by Maintenance > Master Schedule Generator > Generate Campus Schedule.

The schedules generated by the Trial Scheduling Load cannot be saved or accepted.

The trial scheduling load options must be set on the Options tab before you run the scheduling load.

Modify a record:

scheduling/maintenance/masterschedulegenerator/trialschedulingload/schedulestudents.1481318703.txt.gz · Last modified: 2016/12/09 16:25 (external edit)