This is an old revision of the document!
Scheduling > Maintenance > Master Schedule Generator > Trial Scheduling Load > Schedule Load
This tab allows you to run a trial scheduling load and generate a statistics report by grade level. The trial scheduling load tests the courses created by the Master Schedule Generator and any courses that already exist in the campus master schedule. This allows you to determine how well students will be scheduled with courses created by Maintenance > Master Schedule Generator > Generate Campus Schedule.
The schedules generated by the Trial Scheduling Load cannot be saved or accepted.
The trial scheduling load options must be set on the Options tab before you run the scheduling load.
| Field | Description |
|---|---|
| Reschedule Student's Preassigned Sec/Sem |
|
Click Trial Run. The trial scheduling load begins processing.
At the end of the trial scheduling load, a message is displayed indicating the number of students that the trial run attempted to schedule.
| View Load Stats |
Click to view the scheduling statistics report for the scheduling load. Review, save, or print the report. |
|---|
The Texas Computer Cooperative (TCC) is committed to making its websites accessible to all users. It is TCC policy to ensure that new and updated content complies with Web Content Accessibility Guidelines (WCAG) 2.0 Level AA. We welcome comments and suggestions to improve the accessibility of our websites. If the format of any material on our website interferes with your ability to access the information, use this form to leave a comment about the accessibility of our website.