scheduling:maintenance:masterschedulegenerator:trialschedulingload:studentsched

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
scheduling:maintenance:masterschedulegenerator:trialschedulingload:studentsched [2016/12/12 17:46] jstanfordscheduling:maintenance:masterschedulegenerator:trialschedulingload:studentsched [2020/07/08 13:54] (current) – external edit 127.0.0.1
Line 1: Line 1:
-======Stu Sched (Trial Scheduling Load)======+{{indexmenu_n>90}} 
 +======Student Schedules (Trial Scheduling Load)======
  
 <div #message></div> <div #message></div>
Line 5: Line 6:
 //**Scheduling > Maintenance > Master Schedule Generator > Trial Scheduling Load > Stu Sched**// //**Scheduling > Maintenance > Master Schedule Generator > Trial Scheduling Load > Stu Sched**//
  
-<WRAP round intro>This tab allows you to produce the Student Schedules report which displays the schedules for all students who were completely scheduled by the trial run. +{{page>general:scheduling_load_stu_sched_intro}}
- +
-The report is generated after a trial run. For the scheduling load function, print the report before accepting the load.</WRAP> +
 ====View report:==== ====View report:====
  
-^Field^Description^ +{{page>general:scheduling_load_stu_sched_body}}
-^Grades|{{page>general:scheduling_load_grades}}+
-^Student ID|{{page>general:scheduling_load_student_id}}|+
  
-Click **Retrieve Report**. [[general:print|Review, save, or print the report.]] 
scheduling/maintenance/masterschedulegenerator/trialschedulingload/studentsched.1481564762.txt.gz · Last modified: 2016/12/12 12:46 (external edit)