scheduling:maintenance:masterschedulegenerator:generatecampusschedule:options

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
scheduling:maintenance:masterschedulegenerator:generatecampusschedule:options [2016/12/06 20:17] jstanfordscheduling:maintenance:masterschedulegenerator:generatecampusschedule:options [2020/07/08 13:54] (current) – external edit 127.0.0.1
Line 1: Line 1:
 +{{indexmenu_n>10}}
 ======Options (Master Schedule Generator)====== ======Options (Master Schedule Generator)======
  
Line 5: Line 6:
 //**Scheduling > Maintenance > Master Schedule Generator > Generate Campus Schedule > Options**// //**Scheduling > Maintenance > Master Schedule Generator > Generate Campus Schedule > Options**//
  
-<WRAP round intro>This tab allows you to set options for the Master Schedule Generator, which is used to generate the campus master schedule for next year.</WRAP> +{{page>general:scheduling_msg_options_intro}}
 ====Maintain settings:==== ====Maintain settings:====
 +{{page>general:scheduling_msg_options_body}}
  
-^Field^Description^ 
-^Assign Teachers|{{page>general:scheduling_assign_teachers}}| 
-^Assign Rooms|{{page>general:scheduling_assign_rooms}}| 
-^Override Teacher Free Time|{{page>general:scheduling_override_teacher_free_time}}| 
-^Daily Consecutive Tchr Limit|{{page>general:scheduling_daily_consecutive_teacher_limit}}| 
-^Override Room Free Time|{{page>general:scheduling_override_room_free_time}}| 
-^Generate if Unable to Assign Tchr|{{page>general:scheduling_generate_if_unable_to_assign_tchr}}| 
-^Generate if Unable to Assign Room|{{page>general:scheduling_generate_if_unable_to_assign_room}}| 
  
-Click **Save**. 
scheduling/maintenance/masterschedulegenerator/generatecampusschedule/options.1481055444.txt.gz · Last modified: 2016/12/06 15:17 (external edit)